Projects

  • OUTRAM COMMUNITY HOSPITAL

    MAIN CONTRACTOR / BUILDER
    PENTA OCEAN CONSTRUCTION CO., LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    AUG 2016 – MAR 2018

  • PAYA LEBAR CENTRAL

    MAIN CONTRACTOR / BUILDER
    JDC CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    AUG 2016 – SEP 2017

  • NEW STATE COURTS

    MAIN CONTRACTOR / BUILDER
    SAMSUNG C & T CORPORATION

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    JUL 2016 – OCT 2018

  • ABBOTT NUTRITION INTERNATIONAL SINGAPORE

    MAIN CONTRACTOR / BUILDER
    JDC CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    SEP 2006 – MAR 2007

    Image source (http://www.jdc-corpn.com.sg/building.html)

  • ORCHARD MRT T219

    MAIN CONTRACTOR / BUILDER
    PENTA OCEAN/BACHY SOLETANCHE JV

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    SEP 2015 – SEP 2019

  • YISHUN CONDOMINIUM PROJECT (SAPPHIRE)

    MAIN CONTRACTOR / BUILDER
    NAKANO (SINGAPORE) PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1999 – 2000

  • THE MARBELLA @ MOUNT SINAI RISE

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2003 – 2005

  • SOUTH BANK AT NORTH BRIDGE ROAD

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    MAR 2007 – MAY 2008

  • SERVICE APARTMENT @ ORANGE GROVE ROAD

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1998 – 1999

    Image source (https://www.tripadvisor.com.sg/Hotel_Review-g294265-d628642-Reviews-Le_Grove_Serviced_Apartments-Singapore.html)

  • RIO VISTA CONDOMINIUM @ HOUGANG AVE 7

    MAIN CONTRACTOR / BUILDER
    NAKANO SINGAPORE (PTE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2001 – 2003

    Image source (http://www.c168.com.sg/projects-rio-vista)

  • REGENGY SUITE @ KIM TIAN ROAD

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    JUL 2006 – FEB 2008

    Image source (http://business.asiaone.com/property/news/hip-tiong-bahru-awaits-new-condo)

  • PEBBLE BAY CONDOMINIUM

    MAIN CONTRACTOR / BUILDER
    SAMSUNG CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1994 – 1996

    Image source (http://www.h88.com.sg/directory/condo/Pebble+Bay)

  • PARC OASIS BLK 7,8,9,10

    MAIN CONTRACTOR / BUILDER
    SSANGYONG

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1992 – 1993

    Image source (http://niddicock32.rssing.com/chan-16878724/all_p18.html)

  • ONE NORTH RESIDENCES AT BUONA VISTA

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    MAR 2007 – JUN 2008

  • MEYER PLACE CONDOMINIUM AT MEYER PLACE No. 3

    MAIN CONTRACTOR / BUILDER
    BOLVIS (JDC CORPORATION)

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    FEB 2008 – MAR 2009

    Image source (http://www.iproperty.com.sg/property/propertynearmrt/Mountbatten-MRT/?t=dl&mid=74)

  • MAIDERA CONDOMINIUM @ BUKIT BATOK ST 31

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2001 – 2003

    Image source (http://www.condominium.com.sg/the-madeira.html)

  • HDB DEVELOPMENT @ JURONG WEST N6C5 (BLK 678A,B,C & D)

    MAIN CONTRACTOR / BUILDER
    KAJIMA OVERSEAS ASIA PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1999 – 2000

  • EXECUTIVE CONDOMINIUM @ TAMPINES ST.34

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2001 – 2002

    Image source (http://www.executivecondosingapore.com/Pinevale-Exec-Condo-Rental-and-Resale.html)

  • DOMAIN 21 LUXURY CONDOMINIUM @ DELTA ROAD

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    SEP 2005 – NOV 2006

    Image source (http://www.gumtree.sg/a-property-for-rent/orchard-river-valley/2-bedroom-unit-available-at-domain-21-orchard-area-luxurious-condo-living-style/1001619147650910675811409)

  • DBSS -PARKLAND RESIDENCES

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    MAY 2012 – APR 2013

    Image source (http://www.h88.com.sg/index.php?tag=KWAN%20HWEE%20INVESTMENT%20PTE%20LTD)

  • TWIN REGENCY CONDOMINIUM @ KIM TIAN ROAD

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2004 – 2006

    Image source (http://www.estate.sg/twin-regency.html)

  • COSTA RHU CONDOMINIUM

    MAIN CONTRACTOR / BUILDER
    SHIMIZU CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1994 – 1996

  • CHUAN COURT AT LORONG CHUAN

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    DEC 2005 – FEB 2007

    Image source (http://www.singaporeexpats.com/singapore-property-pictures/condo/the-chuan.htm)

  • 15-STOREY RESIDENTIAL BLDG (88 UNITS) @ MOULMEIN ROAD

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2003 – 2004

  • 3 STOREY TERRACE HOUSE @ BLK 4 - 16 CHANGI HEIGHT

    MAIN CONTRACTOR / BUILDER
    TUAN HUAT CONSTRUCTION PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1997 – 1998

  • YAKOGAWA @ BEDOK SOUTH ROAD

    MAIN CONTRACTOR / BUILDER
    NAKANO SINAGPORE (PTE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    APR 2006 – JAN 2007

    Image source (http://www.nakano.com.sg/projects_industrial_2007.html)

  • WAFER FAB @ 60 WOODLANDS INDUSTRIAL PARK D

    MAIN CONTRACTOR / BUILDER
    L.K.ANG CONSTRUCTION PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2000 – 2001

    Image source (http://www.globalfoundries.com/about/manufacturing/200mm-fertigung)

  • ULU PANDAN NEWATER DBOO PROJECT

    MAIN CONTRACTOR / BUILDER
    JDC CORPORATION

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    JUN 2005- JUN 2006

    Image source (http://www.straitstimes.com/singapore/pub-calls-for-proposals-to-build-second-changi-newater-plant)

  • TUAS TEMBUSU BMCC PLANT

    MAIN CONTRACTOR / BUILDER
    JDC CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    Oct 2010 – JUN 2012

  • TUAS SOUTH INCINERATION PLANT

    MAIN CONTRACTOR / BUILDER
    JDC CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1997 – 1999

    Image source (http://www.jdc-corpn.com.sg/civil_plant.html)

  • SRC @ JURONG ISLAND

    MAIN CONTRACTOR / BUILDER
    JDC CORPORATION

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    APR 2010 – APR 2011

    Image source (http://www.businesstimes.com.sg/companies-markets/src-to-shut-secondary-unit-at-singapore-refinery-for-maintenance)

  • SOILTEC FAB 3 MANUFACTURING PLANT

    MAIN CONTRACTOR / BUILDER
    JDC CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    DEC 2006 – APR 2007

  • SIEMEN FACTORY @ MACPHERSON ROAD ( Basement)

    MAIN CONTRACTOR / BUILDER
    L.K.ANG CONSTRUCTION PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2002

    Image source (http://www.a-reit.com/hiTech_Siemens.html)

  • REC - 4D SWITCH YARD AND 4M-4L PILECAPS , SUBSTATION, STORMWATER DRAINAGE, REC - MISC BUILDINGS, RIGID PAVEMENT

    MAIN CONTRACTOR / BUILDER
    BOLVIS (JDC CORPORATION)

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    OCT 2008 – JUL 2009

    Image source (http://www.fluor.com/projects/solar-production-manufacturing-construction)

  • NEC (8 STOREY) WAREHOUSE

    MAIN CONTRACTOR / BUILDER
    OBAYASHI CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1997 – 1998

  • MUTIPLE USER LIGHT INDUSTRIAL DEVELOPMENT AT ADMIRALTY ROAD WEST

    MAIN CONTRACTOR / BUILDER
    NAKANO SINAGPORE (PTE) LTD – TYT BUILDERS PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    APR 2008 – FEB 2009

    Image source (http://www.mondinion.com/Real_Estate_Listings/adid/1718969/Singapore–Singapore–Singapore–Industrial_for_Rent)

  • Multiple User Light Development @ Jalan Pemimpin

    MAIN CONTRACTOR / BUILDER
    JDC Corporation

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    APR 2014 – APR 2015

    Image source (http://propertylaunchlist.com/mapex)

  • 8B @ Admiral -B

    MAIN CONTRACTOR / BUILDER
    TYT BUILDERS PTE LTD (NAKANO SINGAPORE PTE LTD)

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    SEP 2012 – JUL 2013

    Image source (http://www.alllink.com.sg/warehouses.html)

  • LONZA BIOLOGIS TUAS PLANT 2 TUAS SOUTH AVENUE 6-9

    MAIN CONTRACTOR / BUILDER
    BOLVIS (JDC CORPORATION)

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    AUG 2007 – MAR 2008

    Image source (http://www.jdc-corpn.com.sg/civil_plant.html)

  • KEPPEL LOGISTICS WAREHOUSE

    MAIN CONTRACTOR / BUILDER
    SAMSUNG CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1998 – 1999

  • IMFS PROJECT AT ATTAP VALLEY ROAD(SUPER STRUCTURE – FAB BUILDING)

    MAIN CONTRACTOR / BUILDER
    M + W ZANDER(S) PTE LTD(JDC CORPORATION)

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    OCT 2007 – FEB 2008

    Image source (http://www.kenston.com.sg/projects/details/imfs-fabrication-plant-project)

  • HITACHI FACTORY @ PIONEER NORTH

    MAIN CONTRACTOR / BUILDER
    ZHENG ZI CONSTRUCTION PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2001

  • FLATTED FACTORY @ ANG MO KIO PARK I

    MAIN CONTRACTOR / BUILDER
    KOON SENG CONSTRUCTION PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2000

    Image source (http://www.a-reit.com/hiTech_Techpoint.html)

  • CIBA VISION @ TUAS SOUTH AVE 3

    MAIN CONTRACTOR / BUILDER
    NAKANO SINAGPORE (PTE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2004

    Image source (http://www.nakano.com.sg/projects_industrial_2004.html)

  • AZ Building At Paya Lebar Road

    MAIN CONTRACTOR / BUILDER
    TYT BUILDERS PTE LTD (NAKANO SINGAPORE PTE LTD)

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    OCT 2012 – AUG 2013

    Image source (http://latestlaunch.com/a-z-building)

  • AMKOR AT 2-10 SCIENCE PARK

    MAIN CONTRACTOR / BUILDER
    NAKANO (SINGAPORE) PTE LTD

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    AUG 2014 – OCT 2015

  • ACCORD 2 DISTRICENTRE WAREHOUSE

    MAIN CONTRACTOR / BUILDER
    SAMSUNG ENGINEERING & CONSTRUCTION CO.LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1999 – 2000

    Image source (http://propertylistings.sg/NewLaunche/13393/accord-famous-distri-centre-20-toh-guan-road-singapore-608839)

  • ABBOTT NUTRITION INTERNATIONAL SINGAPORE

    MAIN CONTRACTOR / BUILDER
    JDC CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    SEP 2006 – MAR 2007

    Image source (http://www.jdc-corpn.com.sg/building.html)

  • LONZA IV -CELL THERAPY

    MAIN CONTRACTOR / BUILDER
    JDC CORPORATION

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    OCT 2010 – APR 2011

    Image source (http://www.taisin.com.sg/project_uri/industrial/lonza-biologics/?&lang=en)

  • 6 STOREY TOSHIBA MANUFACTURING PLANT @ TAMPINES AVE 10

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2001 – 2003

    Image source (http://www.myce.com/news/toshiba-and-sandisk-build-new-fab-for-16-17nm-flash-memory-68369)

  • 4 STOREY WAREHOUSE @ CHANGI SOUTH

    MAIN CONTRACTOR / BUILDER
    GAMMON PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1996 – 1997

    Image source (http://www.cache-reit.com/property_highlights_of_properties.html)

  • 2 STOREY SINGLE FIBRE OPTIC PLANT @ CHANGI NORTH

    MAIN CONTRACTOR / BUILDER
    MULTI-CON SYSTEMS PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2001

    Image source (http://www.australiandesignreview.com/designwall/325-changi-airport-terminal-3-singapore)

  • POLICE HQ @ CANTONMENT ROAD

    MAIN CONTRACTOR / BUILDER
    KAJIMA OVERSEAS ASIA PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1999 – 2000

    Image source (http://www.cpgcorp.com.sg/CPGC/Project/Project_Details?ProjectID=805)

  • VIVO CITY ( PREVIOUSLY KNOWN AS THE HARBOURFRONT MALL )

    MAIN CONTRACTOR / BUILDER
    PENTA-OCEAN CONSTRUCTION CO., LTD.

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2004 – OCT 2006

  • THE HEEREN @ ORCHARD RD

    MAIN CONTRACTOR / BUILDER
    SHIMIZU CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1992 – 1993

    Image source (http://www.streetdirectory.com.my/stock_images/travel/preview/12742609530664/30357/the_heeren)

  • SPRINGLEAF TOWER

    MAIN CONTRACTOR / BUILDER
    TUAN KAI CONSTRUCTION PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1997 – 1999

    Image Source (http://www.streetdirectory.com/stock_images/travel/normal_show/11156997850986/10048/springleaf_tower_left_view)

  • RE–CONSTRUCTION TO 7-STY BLDG WITH 3 BASEMENTS TO 6-STY BLDG(PARAGON) @ ORCHARD ROAD

    MAIN CONTRACTOR / BUILDER
    KAJIMA OVERSEAS ASIA PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1999 – 2000

  • PROPOSED OF ERECTION OF 7TH STOREY COMMERCIAL BUILDING WITH 32 BASEMENT AT SOMERSET ROAD

    MAIN CONTRACTOR / BUILDER
    Bovis (JDC CORPORATION)

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    FEB 2008 & AUG 2009

    Image source (http://trungtammuasam.biz/singapore)

  • PAYA LEBAR SQUARE

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    JAN 2013 – JAN 2014

  • ORCHARD TURN MIXED DEVELOPMENT AT ORCHARD

    MAIN CONTRACTOR / BUILDER
    PENTA-OCEAN CONSTRUCTION CO., LTD.

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    JUN 2007 – OCT 2008

  • NOVENA SQUARE DEVELOPMENT @ THOMSON ROAD

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1998 – 2000

    Image source (http://www.commercialguru.com.sg/listing/19287004/for-rent-novena-square-tower-a)

  • MPFC (PHASE 2) TOWER 3 @ MARINA BAY

    MAIN CONTRACTOR / BUILDER
    KAJIMA OVERSEAS ASIA PTE LTD (JOINT VENTURE WITH M/S ZHANG HUI)

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    SEP 2009 – JUL 2011

    Source from (https://en.wikipedia.org/wiki/Marina_Bay_Financial_Centre)

  • TANJONG PAGAR TOWER

    MAIN CONTRACTOR / BUILDER
    SAMSUNG C & T CORPORATION

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    SEP 2013 – JUN 2015

    Image source (http://www.ctbuh.org/News/GlobalTallNews/tabid/4810/Article/841/language/en-US/view.aspx)

  • MIXED DEVELOPMENT @ SENGKANG SQUARE (PART PORTION)

    MAIN CONTRACTOR / BUILDER
    KAJIMA OVERSEAS ASIA PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2000

    Image source (http://directory.stclassifieds.sg/singapore-directory/compass+point/company/businessweb/1979733028)

  • JEM AT JURONG GATEWAY

    MAIN CONTRACTOR / BUILDER
    JDC CORPORATION

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    SEP 2011 – FEB 2013

    Images source (https://www.creme-simon.com/events/upcoming-events/7)

  • EXTENSION OCBC BUILDING

    MAIN CONTRACTOR / BUILDER
    NISHIMATSU & LUM CHANG JV

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1994 – 1995

    Image source (http://openbuildings.com/buildings/ocbc-centre-profile-7803)

  • CHINA SQUARE

    MAIN CONTRACTOR / BUILDER
    OBAYASHI SINGAPORE PTE LTD

    PROJECT SCOPE
    REINFORCE WORKS

    CONTRACT PERIOD
    1999

    Image source (http://marcusgohmarcusgoh.com/toys/what-transformers-to-buy-for-working-adults)

  • CHANGI BUSINESS PARK

    MAIN CONTRACTOR / BUILDER
    TYT BUILDERS PTE LTD (NAKANO SINGAPORE PTE LTD)

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    MAR 2011 – JUN 2012

    Image source (https://commons.wikimedia.org/wiki/File:Changi_Business_Park_Hotel.jpg)

  • SUPREME COURT (Basement)

    MAIN CONTRACTOR / BUILDER
    SATO KOGYO CO., LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2002 – 2003

    Image source (http://www.theodora.com/wfb/photos/singapore/singapore_photos_17.html)

  • SPH HEADQUARTER @ TOA PAYOH LORONG 1

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1999 – 2001

  • SINGAPORE POST CENTRE

    MAIN CONTRACTOR / BUILDER
    PENTA-OCEAN LKH-JV

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1996 – 1998

  • RESEARCH COMPLEX WITH BASEMENT @ BUONA VISTA SCIENCE HUB (PART POTION)

    MAIN CONTRACTOR / BUILDER
    GREATEARTH-UNITED ENGINEERS JOINT VENTURE BIOPOLIS PROJECT

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2002

    Image source (http://www.pharmaceutical-technology.com/projects/biopolis)

  • PROJECT ESPLANADE @ THEATRE ON THE BAY

    MAIN CONTRACTOR / BUILDER
    PENTA OCEAN CONSTRUCTION CO. LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1999

    Image source (https://en.wikipedia.org/wiki/Esplanade_%E2%80%93_Theatres_on_the_Bay)

  • UBI TECHPARK

    MAIN CONTRACTOR / BUILDER
    SHIMIZU COPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2000

    Image source (http://www.serviced-offices.biz/offices/Singapore/All_Regions/Singapore/2902)

  • PASIR LABA CAMP

    MAIN CONTRACTOR / BUILDER
    GREATEARTH CONSTRUCTION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1996 – 1997

  • BOARD OF COMMISSIONERS OF CURRENCY (BCCS) @ PASIR PANJANG

    MAIN CONTRACTOR / BUILDER
    KUMAGAI GUMI CO.LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1999 – 2000

  • BIOPOLIS PROJECT @ BUONA VISTA SCIENCE HUB

    MAIN CONTRACTOR / BUILDER
    SAMSUNG CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2002 – 2003

  • TAMPINES SECONDARY SCHOOL

    MAIN CONTRACTOR / BUILDER
    KOON SENG CONSTRUCTION PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1997 – 1998

  • SINGAPORE MANAGEMENT UNIVERSITY

    MAIN CONTRACTOR / BUILDER
    TEAMCON PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2003

    Image source (https://en.wikipedia.org/wiki/Singapore_Management_University)

  • NANYANG POLYTECHNIC

    MAIN CONTRACTOR / BUILDER
    JDC-KIM SENG HENG JV

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1995 – 1997

    Image source (http://www.gwathmey-siegel.com/nanyang-polytechnic)

  • 6 STOREY EDUCATIONAL BUILDING @ CLEMENTI PHASE II

    MAIN CONTRACTOR / BUILDER
    KOON SENG CONSTRUCTION PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1999 – 2000

  • 6 STOREY EDUCATIONAL BLDG @ CLEMENTI (PH I)

    MAIN CONTRACTOR / BUILDER
    KOON SENG CONSTRUCTION PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1997 – 1998

  • TAN TOCK SENG HOSPITAL ( SUPER STRUCTURE )

    MAIN CONTRACTOR / BUILDER
    SSANGYONG-GUAN HO JV

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1995 – 1997

    Image source (http://uncledicko.blogspot.sg/2010/04/tan-tock-sengs-neglected-tombnewsclip.html)

  • TAN TOCK SENG HOSPITAL ( SUB STRUCTURE)

    MAIN CONTRACTOR / BUILDER
    NISHIMATSU & LUM CHANG JV

    PROJECT SCOPE
    REINFORCED WORKS

    CONTRACT PERIOD
    1994

    Image source (http://www.anzhpba.com/tan-tock-seng-hospital.html)

  • SGH PATHOLOGY BUILDING

    MAIN CONTRACTOR / BUILDER
    KAJIMA OVERSEAS ASIA PTE LTD (JOINT VENTURE WITH M/S ZHANG HUI)

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    DEC 2010 – JUN 2012

    Image source (http://www.cpgcorp.com.sg/CPGC/Project/Project_Details?ProjectID=1237)

  • SENGKANG GENERAL HOSPITAL

    MAIN CONTRACTOR / BUILDER
    PENTA OCEAN CONSTRUCTION CO., LTD

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    OCT 2014 – DEC 2016

  • PARKWAY NOVENA HOSPITAL

    MAIN CONTRACTOR / BUILDER
    PENTA OCEAN CONSTRUCTION CO. LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    JUN 2010 – DEC 2011

    Image source (http://www.utracon.com/ucpl/index.php?option=com_content&view=article&id=26&Itemid=34&limitstart=1)

  • NUH MEDICAL CENTRE

    MAIN CONTRACTOR / BUILDER
    PENTA OCEAN CONSTRUCTION CO., LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    MAR 2011 – JUL 2012

    Image source (http://brj.com.sg/t-y-lin-international-wins-association-consulting-engineers-singapore-design-excellence-awards-2015)

  • NG TENG FONG HOSPITAL (SOC BUILDING)

    MAIN CONTRACTOR / BUILDER
    GS ENGINEERING & CONSTRUCTION

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    SEP 2012 – SEP 2013

  • PSA – PASIR PANJANG

    MAIN CONTRACTOR / BUILDER
    MITSUI ENGRG & HOCK LIAN SENG & KEPPEL JV

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1996 – 1997

    Image source (http://worldmaritimenews.com/archives/187056/cosco-pacific-psa-to-invest-in-mega-berths-in-singapore)

  • SERANGOON CENTRAL - BUS INTERCHANGE

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    APR 2009 – JUN 2010

  • PASIR PANJANG CONTAINER PORT TERMINAL PROJECT

    MAIN CONTRACTOR / BUILDER
    PENTA-OCEAN LKH-JV

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1993 – 1994

    Image source (http://www.portstrategy.com/news101/port-operations/port-performance/psahph)

  • NOVENA SQUARE UNDERPASS

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2000

  • MRT Depot C701

    MAIN CONTRACTOR / BUILDER
    HYUNDAI ENGINEERING & CONSTRUCTION CO.LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1998 – 2000

    Image source (http://www.a61.com.sg/infrastructure/project-sengkang-mrt-depot.html)

  • EXTENSION OF VIP COMPLEX @ CHANGI AIRPORT TERMINAL 2

    MAIN CONTRACTOR / BUILDER
    SAL CONSTRUCTION PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2001

    Image source (https://commons.wikimedia.org/wiki/File:Changi_Airport,_Terminal_2,_Departure_Hall_11.JPG)

  • NG TENG FONG HOSPITAL (JGR AREA)

    MAIN CONTRACTOR / BUILDER
    GS ENGINEERING & CONSTRUCTION

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    JUL 2012 – JAN 2013

  • NG TENG FONG HOSPITAL (CH & RH BLOCK)

    MAIN CONTRACTOR / BUILDER
    GS Engineering & Construction

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    JAN 2013 – APR 2014

    Image source (https://www.todayonline.com/singapore/designed-healing-new-hospital-offer-sky-gardens-more-privacy)

  • JURONG GENERAL HOSPITAL AT JURONG EAST ST 21

    MAIN CONTRACTOR / BUILDER
    CIVIL TECH PTE LTD
    (PENTA OCEAN CONSTRUCTION CO., LTD)

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    OCT 2011 – MAY 2012

    Image source (http://www.straitstimes.com/singapore/health/10-things-about-the-newly-opened-ng-teng-fong-hospital-in-jurong-east)

  • Changi General Hospital

    MAIN CONTRACTOR / BUILDER
    PENTA OCEAN CONSTRUCTION CO., LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    OCT 2012 – AUG 2014

    Image source (http://www.northviewsec.net/impressions-day-excursion-changi-general-hospital)

  • BENCOOLEN COMMERCIAL & RESIDENTIAL COMPLEX

    MAIN CONTRACTOR / BUILDER
    HYUNDAI ENGINEERING & CONSTRUCTION CO.,LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1998 – 1999

    Image source (https://en.wikipedia.org/wiki/Bencoolen_Street)

  • A & A CHINATOWN POINT @ 133 NEW BRIDGE ROAD

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    MAY 2011 – NOV 2012

    Image source (http://www.m-ply.com.sg/project/new-chinatown-point)

  • 30 STOREY OFFICE DEV @ CHURCH ST

    MAIN CONTRACTOR / BUILDER
    SAMSUNG CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2000

  • CIRCLE LINE STAGE 2 – CONTRACT C822

    MAIN CONTRACTOR / BUILDER
    ECON ñNCC J.V.

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    MAR 2005 – AUG 2006

  • CHOA CHU KANG LRT

    MAIN CONTRACTOR / BUILDER
    GAMMON PTE LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1997 – 1998

    Image source (https://en.wikipedia.org/wiki/Bukit_Panjang_LRT_Line)

  • CHANGI TERMINAL 3

    MAIN CONTRACTOR / BUILDER
    C & O CONSTRUCTION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2001

    Image source (https://commons.wikimedia.org/wiki/File:Flughafen_singapur.jpg)

  • CHANGI AIRPORT MRT STATION CONTRACT - C504

    MAIN CONTRACTOR / BUILDER
    WAI FONG CONSTRUCTION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2000

    Image source (https://en.wikipedia.org/wiki/Singapore_Changi_Airport)

  • C859A HARBOURFRONT INTERCHANGE ( PARTIAL )

    MAIN CONTRACTOR / BUILDER
    PENTA-OCEAN CONSTRUCTION CO., LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    2004

    Image source (https://publictransportsg.wordpress.com/2013/04/27/harbourfront-bus-interchange)

  • TANJONG PAGAR HOTEL

    MAIN CONTRACTOR / BUILDER
    SAMSUNG C & T CORPORATION

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    JUL 2014 – AUG 2015

    Image source (http://www.ctbuh.org/News/GlobalTallNews/tabid/4810/Article/841/language/en-US/view.aspx)

  • JURONG HOTEL

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    NOV 2013 – AUG 2014

    Image source (http://www.businesstimes.com.sg/companies-markets/genting-hotel-jurong-soft-launching-at-end-of-this-month)

  • A & A MERITIUS MANDARIN HOTEL AT ORCHARD

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    Jul 2008 – Aug 2009

    Image source (http://www.fnetravel.com/english/singaporehotels/mandarin-orchard-singapore.html)

  • AMKOR AT 2-10 SCIENCE PARK

    MAIN CONTRACTOR / BUILDER
    TYT BUILDERS PTE LTD (NAKANO SINGAPORE PTE LTD)

    PROJECT SCOPE
    REINFORCING WORKS & FORMWORK

    CONTRACT PERIOD
    AUG 2014 – OCT  2015

  • M+W MICRON FAB10X EXTENTION

    MAIN CONTRACTOR / BUILDER
    JDC CORPORATION

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    MAY 2015 – SEP 2015

    Image source (http://gautengbuilders.co.za/building-construction-companies)

  • SENGKANG GENERAL HOSPITAL

    MAIN CONTRACTOR / BUILDER
    PENTA OCEAN CONSTRUCTION CO., LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    OCT 2014 – DEC 2016

  • HOTEL RENDEZVOUS

    MAIN CONTRACTOR / BUILDER
    OBAYASHI CORPORATION

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    1997

    Image source (http://comesingapore.com/booking/hotel/175445/rendezvous-grand-hotel)

  • HARD ROCK HOTEL AT SENTOSA

    MAIN CONTRACTOR / BUILDER
    LOW KENG HUAT (SINGAPORE) LTD

    PROJECT SCOPE
    REINFORCING WORKS

    CONTRACT PERIOD
    APR 2008 – AUG 2009

    Image source (http://traveldelight.biz/index.php?page=shop.product_details&product_id=266&flypage=coddii_fly_hotels.tpl&pop=0&vmcchk=1&option=com_virtuemart&Itemid=91)

  • AMARA RESORT HOTEL DEVELOPMENT AT SENTOSA ISLAND

    MAIN CONTRACTOR / BUILDER
    JDC CORPORATION

    PROJECT SCOPE
    REINFORCED CONCRETE WORKS

    CONTRACT PERIOD
    OCT 2005 – JUNE 2006

    Image source (https://www.tripadvisor.com.sg/Hotel_Review-g294264-d662514-Reviews-Amara_Sanctuary_Resort_Sentosa-Sentosa_Island.html)